Showing posts with label Beyond the Cherry Tree. Show all posts
Showing posts with label Beyond the Cherry Tree. Show all posts

Tuesday, January 19, 2016

Hand Quilting BTCT

The past few months of hand quilting have been on projects that I 'had' to get done, and now it's time to pull out my Beyond The Cherry Tree (BTCT).  I saw Lori over at Humble Quilts got another block finished on hers, so this was the nudge I needed to keep mine moving towards finished.

This is all I need to work on this quilt, well, this and time; the elusive element for so many of us.  I use a Roxanne Thimble, the little blue rubber thimble for my pointer finger to help eliminate the stress on my wrist when pulling the needle through, some scissors and the lint brush.  There is always fluff or cat hair or threads that need to be removed.

 I like to load up my spool of thread with a group of needles.  I do this for a few reasons.  The biggest reason it that I can keep track of my needles.  I would hate to loose one on the carpet and then find it with my foot.  The other reason is that it helps me keep my rhythm when stitching. Finish one thread, and just pull off another one.  No need to stop and thread a needle.  I always make sure I end my sessions with the spool loaded up, makes for a fast start the next time I sit down to stitch and I count my needles.


Speaking of spools, my 'go to' hand quilting thread is YLI. It comes on wooden spools and the manufacturer still hasn't realized we need a place to dock or lock our thread.  No worries, a Sharpie and a sharp pocket knife will do the trick.  I just put a little notch in the edge of the spool, and mark it with a dot of Sharpie.  This makes it easy to find the notch when locking the thread.


Here's a picture of my quilt.  Clearly, I have not stayed on task with the quilting as the top was finished in 2012.  My original goal was June of 2015, then it moved to end of 2015 and now I'm thinking end of 2016 is a possibility.  All the blocks have been outlined, and about 2/3 of the border has been outlined.

The 9 center blocks have all the cross hatching completed, but the quilting in the appliqued pieces will wait to the end.  Changing colors will be the last part of the quilting. 


 However, most of the outside round of blocks, 18 in total,  look like this.  Random lines of cross hatching have been stitched, but most blocks are a few hours away from each being finished.  I got a bit done on the weekend.  It's the perfect break from my longarm machine.  Just getting this quilt out and back on the couch is enough to keep me motivated. 


This is definitely my 'best quilt' to date, and I hope I can keep focused on it in 2016 and find those few minutes here and there to keep rocking the needle on this treasure. 

Keep stitching,
Sharon

Monday, October 6, 2014

Milestone Monday

Yes, it has happened. I have got all the appliqued blocks in the center of this 25 block quilt outlined in the cream thread.  You also might know, I've also done some of the grid work in the background as I've gotten bored with the seemingly endless outlining sessions on this piece.


Wow, 25 blocks, that has been a journey. Now I'm on to outlining  the border applique and will continue the cross hatching throughout the body of this piece. I make sure I do some outlining every time I pick up this quilt.  I use it as a warm before I get to the cross hatch stitching.


As I spread this out to snap a few photos, I took a closer look at my progress.  I realized I'm almost finished all the background grid in the center 9 blocks.  Just a bit left on these two blocks.



Once all the cream hand quilting is done, I will bind the quilt. At that time, I will go back and finish the individual block quilting. Many flowers, vases, and leaves need more quilting, but I want to do this in matching threads.

An outside block that is almost finished. 


This just goes to show that you hand quilt a large quilt just like they say, "one stitch at a time"


And I would be remiss if I didn't share a photo of the back.  I love running my hand over the back, the tactile feel of this is amazing.  It's like running a hand over the past, I see my grand parents, their home, my childhood, and yet, we did not have quilts.  It's just the "feel good" feeling I get. 
 
Just like the feeling I got the other day when I walked down the driveway at my guys place, opened up the mailbox, inserted an envelope with a stamp on it and put the flag up. Yes, they still pick up the mail from your private mailbox in his neighborhood.

My BTCT goal has been bumped by a year, the new goal is June of 2015. I took the first stitches on the quilting Jan. 1, 2013 but took a good 6 month hiatus from this last fall/winter. It's amazing how a guy can take up quilting time. *vbg*  Now I'm trying to stitch on it every day, for a minimum of 30 minutes. That usually extends to 45 - 60 and it's a matter of giving this some priority in my day.

Are you doing any hand work this winter? If so, please share

Sharon



Wednesday, June 18, 2014

The Journey Continues

There was some uninterrupted time on Monday and I took full advantage of it.  The outline stitching on this block is now finished, and it's time to move on to another section.
The hand quilting was started Jan 1, 2013 and each time I sit with this quilt, it gets a little closer to finished. My goal of July 2014 had been pushed back to Dec 2014, but that is in pencil. The passage of time and the memories that are stitched into this piece continue to grow, it gives me great satisfaction to pick this up and rock the needle.

We had a crazy looking sky last night and I had to snap a few pictures while driving. This was sunset, no storm happening, just a very cool cloud formation.



The longest day is coming soon, I love spending that evening at the beach, savoring every last minute of the day.  Lets hope its a sunny one on the 21st.

Sharon

Monday, November 11, 2013

BTCT Update

I've been poking away at this over the summer and now it's the perfect time to get back at this quilt. Today is my first day of Unemployment Enjoyment. I have my resume updated, have started looking for work, and will stay positive that a good job will become available that matches up with my skill set. In the meantime..........
Let's QUILT!

I've assessed this piece and I have 15 of the 25 blocks completely outlined in the white thread. The other 10 are in some state of finish, some just need a few more things outlined and others have not been touched. Nothing has been done on the border outlines. I'm focused on the outlining, this is where I start when I pick this up and then I like to end with a little of the x hatching.

One stitch at a time, that's how this will become a quilt!
Sharon

Saturday, February 9, 2013

One Bite at a Time

I promised I wouldn't bore you with lines of hand quilting every few days, but would show my progress once a month. Trying to hand quilt everyday hasn't been difficult, hey, it was January. I am outlining all the applique, so a lot of that had to get done before I could start working in the grid lines.  Now I'm at a point where I can bounce back and forth.  Outlining is a PITA job, as the quilt is a tank to constantly shift. (I quilt in my lap).


I managed to stitch 28 out of 31 days. This quilt is just like the saying, "How do you eat an elephant?" "One bite at a time" This quilt will get stitched one stitch at a time, so even if I only have 15 minutes, that's 15 minutes closer to being finished.



Looking at what I accomplished in January has made me rethink my July 2014 deadline. I'm now thinking Dec 2014.


There are 25 blocks plus borders and after one month I can comfortably say 2 blocks are completely finished. I have ignored my machine quilting work in January, there is no gardening, I've been trying to rehab a broken bone in my foot (unsuccessfully) so no walking or yoga.


So you see where I'm going with this? In January I had an extraordinary amount of time to sit on my butt and rock the needle.
I hope I can keep the momentum, but some days there just are not enough quilting hours, I'm sure most of you can relate.
Sharon

Tuesday, January 8, 2013

Hand Quilting BTCT

I thought I'd share how things are going with my BTCT. If you see me blogging about  "the Tank" please know I'm referring to my Beyond the Cherry Tree quilt.  Good grief, 100 x 100 is a lot of quilt to maneuver around on your lap.

I've figured out a few things.

Two needles are better than one.  I can quilt twice as much and only shift the quilt once.  I also leave a long tail on each thread so I can pick it up and go in the opposite direction and I'll have 1/2 the knots in my top.

I wore down my thumb nail pulling the needle through the quilt. I'd get little grooves in it, so I'd file them out and pretty soon I was filing my skin as my nail was getting so short. Then my nail split.  Pondering how I was going to continue this process for the next 18 months or so, I came up with an idea.  Now I have an acrylic nail on my thumb; I quilted for 2+ hours on Sat night and not a dent or a chip to be seen!  The $3 fix.  Manicures for the next year or so............are you feeling sorry for me? ;-)

I'm outlining all the applique about a 1/16 to an 1/8th of an inch away from the design, usually I stitch so close to the applique that you can't even see the stitches.  Lori and Humble Quilts works like this and I love how it looks. 
That's what I love about blogging, quilters across the world or across the street can all teach us something new.  The marking done by Bellwether Dry Goods is amazing.  If you click on the first picture of this post, you can see that the line just disappears once it's stitched.  When I was basting this, I saw places that still had eraser rubbings on the top, they made corrections that were 1/16th of an inch difference.  They strive for perfection and did an amazing job for me.

So far I have this much done and I've got 6-7 hours into it so far................

Sharon
.

Tuesday, January 1, 2013

Purpose Driven

It seems to be easier to finish a project when there is a deadline or a purpose for whatever task is at hand. The start of this year began with lists; lists of quilts in motion, tops that need backs and quilting, blocks in boxes that need to be transformed into a top and eventually into a quilt and kits that have never seen the light of day. If I can tag a purpose or a deadline to a project, I know my chances of a finish are a lot better. I realized a purpose for this project while I was away, and I'm starting the year with a finish.
They say that what you do today, you do for the year. I'm covering all my bases. After piecing this little project, I made the back, layered it and started the machine quilting. It's simple, but effective.
Since I love applique, I thought I better add it to the mix of things today, and I got the flower and a few leaves stitches down.
And true to my plan, I've organized and started the hand quilting on my BTCT. I was asked a few questions, so here are a few details.
The thread is YLI Natural, I use John James #10 Betweens needles, the batting is Quilters Dream Select. This top measures 100 x 100 so I'm sure I'll empty this spool and put a dent into a new one.
My goal for the hand quilting is the summer of 2014. Since hand quilting makes for a boring blogger, I will post my progress on this once a month.

I also realized how much I got done while being "unplugged" over Christmas. As much as I love reading and commenting and posting, I may be putting a self imposed limit on my computer time.

Happy New Years to all!
Sharon

Wednesday, December 19, 2012

It's Back!

I arrived home from work on Monday to find this little box tucked up in the corner of my front porch. It was my Beyond the Cherry Tree top, back from the marker.

I asked for 3/4" cross hatching and single lines in the border. 

If you click on the picture below you can see the transition on the borders in the corner.
Here are the details.  It was sent to Bellwether Dry Goods and I was charged $14/hour.  The top is 100 x 100 and it took 9 3/4 hours so $136.50  Since I live on the other side of the country, there was also my shipping charges in and out which totaled $42.82.   I could not have even considered marking this top, let alone have it done in under 10 hours. I'd be 10 days working on something like this and it would have been a mess.  Merry Christmas to myself, money well spent for a craft that I enjoy so much.  It's certainly cheaper than therapy and there's nothing more relaxing that rocking a needle, up and down, up and down.

Jingle Bells,
Sharon

Sunday, September 16, 2012

Finally! Beyond the Cherry Tree

My pictures aren't that great, but it's past my bedtime and I will take some better ones later this week. Yes, I'm doing the happy dance. All four borders are attached to the 25 blocks in the center.
I put my initials at the center of the top.
The side borders are similar to the pattern, but I did my own thing on the top and bottom. I added some birds to the bottom as well as grape clusters.
I'm very happy that I added purple to the borders, I think it adds a little something.

I must get to bed, it's a work day tomorrow. I've been working on other peoples quilts this weekend, but I was so close that I had to do the final embroidery and add the final border before bedtime.

There is a little bit of finishing in the corners, nothing an evening of TV would solve.
Hope your weekend was as exciting as mine!
Sharon

Friday, July 6, 2012

Borders Added

I hope you are not sick of seeing my Beyond the Cherry Tree project. It's been a long haul but I'm sticking with it and I've started border #3. In the meantime, I've added the side borders.
The pattern shows the borders added "log cabin" style. I've changed things up, I've put the sides on and will let the applique just run off into the seam allowance.

The top and bottom borders are going to have a few additions, right now I'm stitching down the vine on #3. I will make decisions as I go along, I want it to be original and have some flowers/fabrics tie back into the center.

If you want to see the latest finish of a BTCT, pop over to Mimi's Passions.  She has just got her's back from her quilter and only needs to bind and label her masterpiece.  Go check it out!

Sharon

Friday, May 4, 2012

I Wanted a Date

I know, you have to put yourself out in social situations to get a date, not sit at home with your leg up on a pillow and a glass of wine by your side.  But I really wanted a date,...........on my Beyond the Cherry Tree quilt.  I've pondered putting a vase on the bottom border and the date inside that, but when I looked at my blocks,this one seemed so big and dark.  It was the perfect place for a date and this is going to be my center block
I finally made it up the stairs at work today and got my blocks all arranged on the design wall. (Yes, we have an amazing big room with a huge design wall, thanks to Debs) This needed to be reverse appliqued so I did that tonight. Two borders have the vines and cherries stitched down. You were right, Lori, the borders do go fast. Now if only I had prepped the leaves like I did the cherries.

At least I'm getting around, I've spent every bit of home time with my leg up, trying to be a good patient. I think I'm done with that, I have too much to do and I'm way behind on my customer quilts. Losing 2+ weeks when I work full time is a lot, so I shall have my head down and be busy this weekend.

Thank goodness my lawn will get mowed while I'm at my JT2 meeting tomorrow! Nothing like gardening by check!

I hope everyone has some sunshine this weekend, we are hoping for a sunny Sunday in my corner of the world.
Sharon

Friday, April 27, 2012

Slow Going

It's been a while since I've posted. No, I didn't revamp my blog. I can't seem to save a copy, and I don't have the patience to redo things at this time. I've been working on two projects that are both slow going. Hand quilting wreaths and outlining all the applique on this one.
All the threads are just my basting stitches, I cut them as I go along.
Stitching down yards of 1/4" bias for the borders of my Beyond the Cherry Tree.
I started stitching the cherries, thinking I had prepped all that I needed.


Not so much. I realized I'm about 60 short so out came the scraps of reds and the paper templates.

These go fast when one is sitting doing this. 


This has been my spot every evening since the weekend. I twisted my knee Friday night, and per Dr.'s orders, I'm resting and icing it. She says 7 - 10 days and I'm really trying hard to be a good patient. I'm itching to get back to machine quilting and yoga. I'm hoping for Monday.

My big project at work has peeked, that happened Tuesday afternoon.  What a relief to submit all my files and reports.  Now to wait and see what is accepted and what needs adjustments.  The biggest part is over though.  What a learning curve for me!

I'm teaching Hand Quilting this Saturday at Fabric Etc in Bellingham. There's room for one or two more, any takers?

Have a great weekend

 Sharon

Wednesday, March 28, 2012

18 months later....

Block 25 of BTCT
 Can you hear me squeal with delight? No? that's because I'm still on the mend. I'm definitely on the upside of this cold, it just hit me out of no where, not even a sniffle or cough for a warning. I actually had this block finished last Friday and just didn't have the mojo to even post it! But here it is, the final block for my Beyond the Cherry Tree.  Slightly modified from the pattern, it's a little quirky.
The blocks need the cherry stems embroidered, and then I will square them all up and sew the center together. I've got my cherries all ready for the border, the strips of fabric are cut, and I've got yards of 1/4" bias ready to glue baste and stitch. The perfect hand work for the Stanley Cup playoffs. That's hockey for you non hockey peeps! Playoffs will run from mid April to mid June. Surely I should have 2 borders done in that time!

Here is my latest block in the JT2. I believe I will remake this block, making a slight modification to honor the Infinite Variety display. Stay tuned for that.
The push to finish a few more blocks in this project is that I have been asked to speak at my guild about the Red and White show, bring my blocks and my own small collection of red and white pieces and also share some of my hand quilting pieces.
I'm honored to be asked, excited to talk about the show and nervous all in one.
Thanks for following along my BTCT journey, I feel I'm about 1/2 way to finished.  It's only been 18 months, what's the hurry?
What have you finished lately?
Sharon

Friday, March 23, 2012

and then there was one

Yes, there is always a time when you only need to make one more block, and that time has arrived.
One more block for my Beyond the Cherry Tree quilt center.
Thank you Liz, I love this block pattern.  I did a little improvising with the circles on the vase, it just seemed too big with the fabric choice I made.
Tomorrow I'm heading out for the local shop hop, it goes as far south as Everett, WA but we will probably get to Smoky Point, over to Anacortes and then work shop our way back north.  I will be shopping for a set of batiks. I like to focus on these shopping days so I keep projects in mind while out on tour.
Happy Friday to all!
Sharon